We worked with Microsoft to shape a new graphic environment in Lincoln Square’s North Tower. The work was performed off peak hours in order to minimize disruption to Microsoft’s new neighbors.
Our project managers are well versed in mapping a path to ensure each stage of your job is installed on time and on budget.
Our project managers are well versed in mapping a path to ensure each stage of your job is installed on time and on budget.
Microsoft Lincoln Square
This project covered eight floors which were built and installed on a rolling schedule. Precise planning allowed us to be ready for installation as soon as each floor’s build was completed.
While we printed close to fifty murals and wood graphics for this job, the floor numbers required the most engineering. Two foot tall and two-inch thick aluminum is very heavy. We found a way to reduce the weight by 80%, aiding in both manufacturing and installation.